I opened Update #57, posted 17 October 2026, and copied the dates instead of the March 2025 line on the tier cards. Cryptozoic called the December window an estimate. A pinned comment on that update put address lock in mid-to-late November 2026. I am not turning any of those into a guaranteed doorstep day.
Timeline in the update
| Step | Estimate |
|---|---|
| Production finished | Stated 17 October 2026 |
| Pack-out | About 27 October 2026 |
| US arrival at QML, Florida | 3 December 2026 |
| US fulfillment starts | 8 December 2026 |
| EU, UK, and other regions arrive | 19 December 2026 |
| Those regions start fulfillment | End of December 2026 |
| Address lock | Mid to late November 2026, from the pinned comment |
The Roblox game already launched on 21 October 2026. If your search was about playing tonight, use the Roblox download page. This page is only the cardboard.
Questions people ask
When does the Adventure Time RPG tabletop ship?
Update #57 says production is finished. US stock was estimated to reach QML in Florida on 3 December 2026, with fulfillment starting 8 December 2026. EU and UK stock was estimated to arrive 19 December, with fulfillment at the end of December 2026.
Why do pledge cards still say March 2025?
That was the original estimate. The campaign page had not rewritten every tier card when this site checked on 23 October 2026. The newer update is the one to trust, and it is still an estimate.
Sources checked 2026-10-23
- Kickstarter Update #57 — accessed 2026-10-23
- Kickstarter — Adventure Time: The Roleplaying Game — accessed 2026-10-23
- Cryptozoic press note — accessed 2026-10-23
Checked on 2026-10-23. Figures that move (player counts, prices, shipping) are snapshots, not live feeds.